In order to perform necessary maintenance, inspection or equipment modifications, interruptions in building services or systems will take place. In all cases, every attempt will be made to keep the inconvenience to a minimum. If you have any questions, please contact one of Facilities Management’s service desks:
Academic division
(434) 924-1777
Health system division
(434) 924-2267
Planned & Emergency Utility Outages
-
2/6/2026 2:00:00 PM thru 3/16/2026 10:30:00 AM
Affected Buildings: UNIVERSITY HOSPITAL
Affected Utilities: Chilled Water
Reason: MRI #3 - Replacement - Project - Contact: Nathaniel Brown 434-962-1787
-
2/6/2026 2:30:00 PM thru 3/16/2026 2:30:00 PM
Affected Buildings: UNIVERSITY HOSPITAL
Affected Utilities: Electricity
Reason: MRI #3 - Replacement - Project - Contact: Nathaniel Brown 434-962-1787
-
2/28/2026 5:00:00 AM thru 2/28/2026 3:00:00 PM
Affected Buildings:
Affected Utilities: Domestic Water
Reason: Maintenance - Contact: Drew (Beaver) Jordan 434-422-6879
-
2/28/2026 6:00:00 AM thru 2/28/2026 10:00:00 AM
Affected Buildings: UNIVERSITY HOSPITAL
Affected Utilities: HVAC
Reason: Shell Space Room 1038 - Project - Contact: Nathaniel Brown 434-962-1787
-
2/28/2026 6:00:00 AM thru 2/28/2026 10:00:00 AM
Affected Buildings: UNIVERSITY HOSPITAL
Affected Utilities: Electricity
Reason: UH Guided Ultrasound & MRI Expansion - FACP22 042 - Project - Contact: Rebecca Hord 434-989-2329
-
2/28/2026 7:00:00 AM thru 3/1/2026 4:00:00 PM
Affected Buildings: UNIVERSITY HOSPITAL
Affected Utilities: Fire Alarm System
Reason: UH Fire Alarm Annunciation Replacement Phase 2 FACP22 003 - Project - Contact: Mark Humbertson 434-906-5206
-
2/28/2026 7:00:00 AM thru 3/6/2026 7:00:00 AM
Affected Buildings: BAYLY BUILDING, CAMPBELL HALL, CARR'S HILL / PRESIDENT'S HOUSE
Affected Utilities: Chilled Water, Chilled Water, Chilled Water
Reason: Campbell Hall Electrical Service Replacement - Campbell Hall Switch gear and emergency back up install - Contact: Donald (Randy) Spencer 434-531-6993
-
2/28/2026 7:00:00 AM thru 3/6/2026 4:00:00 PM
Affected Buildings: CAMPBELL HALL, CARR'S HILL FIELD SUPPORT FACILITY, CHW DISTRIBUTION SYSTEM @ CARR'S HILL, DRAMA EDUCATION BUILDING
Affected Utilities: Electricity (Normal and Emergency Power), Electricity (Normal and Emergency Power), Electricity (Normal and Emergency Power), Electricity (Normal and Emergency Power)
Reason: CS: Campbell Hall Electrical Service Replacement - Switch gear replacement. - Contact: Donald (Randy) Spencer 434-531-6993
-
3/2/2026 6:00:00 AM thru 3/3/2026 6:00:00 PM
Affected Buildings: CHEMISTRY BUILDING, CHW GENERATING EQUIPMENT @ CHEMISTRY BLDG
Affected Utilities: Chilled Water, Chilled Water, Chilled Water
Reason: Replace leaking flange and associated pipe within the basement level of Chemistry Addition. -
3/3/2026 7:00:00 AM thru 3/3/2026 9:00:00 AM
Affected Buildings: MOLLY AND ROBERT HARDIE FOOTBALL OPERATIONS CENTER
Affected Utilities: Fire System Fire System Panel
Reason: Football Operations Center - Fire Alarm and AV interface testing in S&C. - Contact: Kenneth Bower 434-987-4206
-
3/4/2026 7:00:00 AM thru 3/4/2026 8:00:00 AM
Affected Buildings: MECHANICAL ENGINEERING
Affected Utilities: Electricity Normal Power
Reason: To install a new breaker and connection to the circuit for the exhaust fan in room 109. - Contact: Randolph Campbell 434-566-6036
-
3/6/2026 10:00:00 AM thru 3/6/2026 12:30:00 PM
Affected Buildings: PHYSICS/JESSE BEAMS LABORATORY
Affected Utilities: Electricity Normal Power
Reason: Physics Building Renovation - Cx Facilities Dynamics will perform a blackout test for Final Commissioning. - Contact: Randolph Campbell 434-566-6036