Utility outages

In order to perform necessary maintenance, inspection or equipment modifications, interruptions in building services or systems will take place. In all cases, every attempt will be made to keep the inconvenience to a minimum. If you have any questions, please contact one of Facilities Management’s service desks:

Academic division
(434) 924-1777

Health system division
(434) 924-2267

Outage Subscription Manager

Planned & Emergency Utility Outages


  1. 8/15/2025 3:00:00 PM thru 9/2/2025 3:00:00 PM
    Affected Buildings: GARRETT HALL
    Affected Utilities: Fire System Fire Suppression
    Reason:
  2. 8/18/2025 7:00:00 AM thru 8/18/2025 3:00:00 PM
    Affected Buildings: FRANK C. MCCUE III CTR
    Affected Utilities: Fire System Fire System Panel,Sprinkler System
    Reason: Olympic Sport Complex - Sprinkler outage needed to connect and adjust portions of McCue and Addition due to renovation work.
  3. 8/18/2025 7:00:00 AM thru 8/21/2025 5:00:00 PM
    Affected Buildings: COBB HALL
    Affected Utilities: HVAC
    Reason: Cobb/Shumway Project - Shutdown is for the unit DOAS-2 in Cobb Hall. Replace the fans in DOAS-2 with a new fan array design to help with TAB.
  4. 8/19/2025 6:00:00 AM thru 8/19/2025 8:30:00 AM
    Affected Buildings: THORNTON HALL
    Affected Utilities: HVAC
    Reason: CS: Thornton Hall B&D HVAC Optimization Project Phase II - Re-install radiator at window.
  5. 8/19/2025 5:00:00 PM thru 8/19/2025 11:00:00 PM
    Affected Buildings: PINN HALL
    Affected Utilities: Domestic Water
    Reason: Maintenance
  6. 8/20/2025 4:00:00 AM thru 8/20/2025 8:00:00 AM
    Affected Buildings: UNIVERSITY HOSPITAL
    Affected Utilities: Chilled Water
    Reason: CT-8 Equipment Renovation - Project
  7. 8/20/2025 6:00:00 AM thru 8/20/2025 8:00:00 AM
    Affected Buildings: CLARK HALL
    Affected Utilities: Fire System Sprinkler System
    Reason: CS: Clark Hall - 277 Acid Hood Installation - Near the beginning of this project, we turned up a sprinkler head to prevent it from being hit during a fume hood replacement. Now that the new fume hood has been placed, we would like to drop the sprinkler head back down.
  8. 8/20/2025 6:00:00 AM thru 8/20/2025 12:00:00 PM
    Affected Buildings: MEDICAL SCHOOL BLDG
    Affected Utilities: Electricity
    Reason: OMS Vivarium HVAC Renewal - Project
  9. 8/20/2025 6:00:00 AM thru 8/20/2025 12:00:00 PM
    Affected Buildings: MEDICAL SCHOOL BLDG
    Affected Utilities: Fire Alarm System
    Reason: Maintenance
  10. 8/20/2025 6:00:00 AM thru 8/20/2025 6:00:00 PM
    Affected Buildings: MEDICAL SCHOOL BLDG
    Affected Utilities: Chilled Water
    Reason: UVA OMS Vivarium HVAC Replacement - Project
  11. 8/21/2025 5:00:00 PM thru 8/22/2025 12:00:00 PM
    Affected Buildings: AURBACH MEDICAL RESEARCH BUILDING
    Affected Utilities: Building Steam
    Reason: Maintenance
  12. 8/22/2025 6:00:00 AM thru 8/22/2025 12:00:00 PM
    Affected Buildings: PRIMARY CARE CENTER
    Affected Utilities: Fire Alarm System
    Reason: Maintenance