The 415 Ray C Hunt Drive - Third Floor Fit-Out project provided two new
Patient Care Centers, Spine and Hand, which provides multidisciplinary
services in a single location. The project consisted of the fit out of
approximately 21,000 gsf on the third floor of an existing three story
clinical office building. The first two floors provide various outpatient clinical
services.
The new Spine Center brings practioners from
Neurosurgery, Orthopedics, Neurology and Physical
Therapy together into one location. There are also
pain management services provided within the Spine
Center. The new Hand Center brings together practioners from
Orthopedics, Plastic Surgery, and Physical Therapy. The
remainder of the building houses a four-ray room
Radiology Suite, a conference room, and a staff lounge.
The project utilized the existing utilities
infrastructure and provide improvements as required by
the selected equipment. The finishes match existing
finishes throughout the Health System with regards to
quality. All proposed finish selections were approved
by the Health System finishes committee and meet or
exceed LEED requirements.
|