Helipad Relocation (Comp)

FPC Desktop     FPC Links & Forms     Prof Svcs & Construction Info

 

By raising the helipad to the roof of the Main Hospital, a potential conflict of the East Chiller Plant and a proposed Emergency Department Expansion was avoided. The new Helipad functions as the main landing pad for Helicopters arriving at the Hospital.

Also included in the project was the extension of two hospital service elevators in the East Elevator Bank, walkways and safety nets to the pad location from the extended east elevator bank, as well as column upgrades to support the helipad loads.

The Helipad is a 46 foot square aluminum pad above the existing roof. The helipad system is designed with provisions for snow melt systems, all required FAA lighting and wind indicators, and any required filtration to protect the penthouse air intakes for the hospital HVAC systems.

The project was completed in July 2012.


Facilities Planning & Construction - 575 Alderman Road - PO Box 400726, Charlottesville, VA 22904-4726 - (434) 982-4621 - Fax: (434) 982-4628
Site Maintained by: FP&C Webmaster
This Page Last Modified: Friday, April 26, 2013 09:21:31 AM -0400 
© 2013 by the Rector and Visitors of the University of Virginia - Copyright/Privacy/Advertising