Facilities Design Guidelines

FP&C Links & Forms           Professional Services & Construction Info  


The November 2004, 7th edition of the University of Virginia Facilities Design Guidelines are now ready and become effective on all projects as of December 1, 2004. Application will be consistent with CPSM clause 700A.3.1 and the HECOM clause 7A.1.3.1 under the "code implementation" section.

THE FOLLOWING UPDATE WAS POSTED ON SEPTEMBER 18, 2007:
INT-10.2.2 - Locksets

THE FOLLOWING UPDATES WERE POSTED ON MARCH 28, 2007:
GR-2.2 - Security
Appendix EL - Elevators
Appendix S - Security References

The 2002 Facilities Design Guidelines were updated to reflect changes in University policy, experience and your suggestions. The new 2004 guidelines have been posted in a single Adobe Acrobat PDF file (the "Complete Facilities Design Guidelines" link below) as well as in separate PDF files for each section, along with separate AutoCAD DWG and PDF files for each figure or drawing within those sections that include them.
(The PDF formatted files are recommended for those not using AutoCAD where both DWG and PDF are available).

Complete Facilities Design Guidelines: November 2004, 7th Edition (4.9 MB PDF)
   
    By Section:  

Section 1:

Credits and Contents (51.8 KB PDF)
   

Section 2:

Vision Statement (8.3 KB PDF)
   

Section 3:

Foreword (7.8 KB PDF)
   

Section 4:

Introduction (8.1 KB PDF)
   
Section 5: Historical Preservation (11.2 KB PDF)
   
Section 6: General Requirements (119.9 KB PDF)

Figures:

GR-1 - Major University Areas (8.3 MB DWG) or (1 MB PDF)
  GR-2 - Historic Grounds (2.2 MB DWG) or (537 KB PDF)

GR-2.2 - Security (24  KB PDF)
  GR-3 - Academical Village (5.9 MB DWG) or (408 KB PDF)
GR-4 - Project Approval Procedures (25.2 KB PDF)
GR-5 - Building Dedication Plaques (190 KB PDF)
   
Section 7: Site Work (57.5 KB PDF)

Figures:

SW-1 - Cast Iron Light Fixture (79.9 KB DWG) or (36.2 KB PDF)
  SW-2 - Parking Lot Light Fixture (51.3 KB DWG) or (33.5 KB PDF)
  SW-3 - Observatory Hill (3.2 MB DWG) or (1.36 MB PDF)
  SW-4 - Sidewalk and Curb (305 KB DWG) or (32.7 KB PDF)
  SW-5 - Brick Walk Paving (166 KB DWG) or (37.6 KB PDF)
  SW-6 - Bicycle Rack (70.8 KB DWG) or (19.4 KB PDF)
  SW-7 - Emergency Phone (87.2 KB DWG) or (28.6 KB PDF)
  SW-8 - Removable Metal Bollard (110 KB DWG) or (48.8 KB PDF)
  SW-9 - Wood Bollard (79.8 KB DWG) or (21.8 KB PDF)
  SW-10 - Metal Bollard (43.5 KB DWG) or (26.3 KB PDF)
  SW-11 - Traditional Guardrail (53 KB DWG) or (28.1 KB PDF)
  SW-12 - Traditional Stair Railing (54.3 KB DWG) or (23.8 KB PDF)
  SW-13 - Construction Fencing (184 KB DWG) or (44.9 KB PDF)
   
Section 8: Building Envelope (52.7 KB PDF)
   
Section 9: Interiors (39.8 KB PDF)
  INT-10.2.2 Locksets
   
Section 10: Building Services (142.6 KB PDF)

Figures:

BSRV 30-1 - Chilled Water Pump Requirements (44.3 KB DWG) or (35.2 KB PDF)
  BSRV 30-2 - Sequence of Operation (32.5 KB DWG) or (21.5 KB PDF)
  BSRV 50-1 - Panelboard Schedule (84.9 KB DWG) or (20.3 KB PDF)
   
Section 11: Appendix CA - Contract Administration (22.7 KB PDF)
Appendix EL - Elevators (43 KB PDF)

Appendix S - Security References (25 KB PDF)
   
Section 12: Guidelines Index (44.5 KB PDF)
   
If you don't yet have Adobe Reader, which is required to view PDF files, click on this link to download this free program.
GetAcrobatReader.gif (712 bytes)

 

Facilities Planning & Construction - 575 Alderman Road - PO Box 400726, Charlottesville, VA 22904-4726 - (434) 982-4621 - Fax: (434) 982-4628
Site Maintained by: FP&C Webmaster
This Page Last Modified: Monday, July 21, 2008 08:44:30 AM -0400
© 2005 by the Rector and Visitors of the University of Virginia - Copyright/Privacy/Advertising